Skip to content

K12 EDUCATION PORTFOLIO

VERONA HIGH SCHOOL

Verona Area School District, Verona, WI

SPECIFICATIONS

LOCATION

Verona, WI

SIZE

580,000 SF

CLIENT

J.H. Findorff & Son, Inc.

ARCHITECT

Eppstein Uhen Architects

CONTRACT AMOUNT

$16.6MM

FEATURED

Two 3000-amp electrical utility services

Photo Credit: Eppstein Uhen Architects

This new high school, at 580,000 square feet, is the largest high school in the State of Wisconsin. The project commenced in the spring of 2018 and was completed in time for the 2020-2021 school year.  

The project consisted of three stories of academic space with a four-story atrium that separates the classroom towers. The building includes a state-of-the-art performing arts center, a pool wing that includes both a competition pool and a community pool, a music and arts wing, a field house wing with a 41,000 square-foot gymnasium, lighted football and soccer stadiums, lighted baseball and softball fields, remote concession stands and practice fields, and lighted walking paths.  This is a design-assist project, in that we provided value engineering input and constructability input to the design team with the goal of giving the owner the best products at the best value while meeting all budget criteria.

We were responsible for all electrical and communication systems including, but not limited to, two 3000 amp electrical utility services, backup generator, power, lighting, fire alarm, two-way communication, overhead paging, building intercom, clock system, security card access, security cameras, phone and computer cabling, and Wi-Fi. The challenging parts of this project included the BIM layout and constructability due to the sheer size and complexity of the structure.