Higher education PORTFOLIO
UW-Whitewater Fischer & Wellers Renovation
State of Wisconsin, Whitewater, WI
SPECIFICATIONS
LOCATION
Whitewater, WI
CLIENT
State of Wisconsin
CONTRACT AMOUNT
$1.6M
FEATURED
Medium voltage services and distribution replacement
Photo Credit: UW-Whitewater
This project involved two separate 4-story-with-basement dormitories originally built in the early 1960’s. Each dorm was remodeled consecutively so only one building was under construction during the school calendar year. Fischer Hall and Wellers Hall were both remodeled with bathroom additions, an expanded lobby, and new elevators. Wellers Hall was further equipped with a medium voltage duct bank and an adjoining manhole with a pad mounted switch.
The full scope of work included medium voltage services and distribution replacement, complete lighting replacement, upgraded door security, CATV cabling, replacement of all voice & data cabling, and installation of emergency generator sets.