Randolph School Addition/Remodel

K12 education PORTFOLIO

Randolph School Addition/Remodel

Randolph School District, Randolph, WI

SPECIFICATIONS

LOCATION

Randolph, WI

SIZE

108,000 SF

CLIENT

J.P. Cullen

ARCHITECT

Excel Engineering, Inc.

CONTRACT AMOUNT

$2.1MM

FEATURED

Multiple sound systems for all areas of the school

Photo Credit: Excel Engineering, Inc.

The Randolph School project consists of renovations to the existing 25,000 square feet of school and an 83,000 square-foot addition. The addition will include expanding the existing gymnasium and adding a new cafeteria and kitchen, locker room wing, and elementary school wing. The renovation of the existing building will allow for the current high school area to be altered into both a high school area and a middle school area so that all grades will share the same building. This project includes a full electrical scope complete with new lighting, switchgear and service upgrade, fire alarm system, security system, and multiple sound systems to accommodate the multiple areas of the school. The work in the existing section will upgrade all of the current fixtures and devices to new ones.

Hempstead High School Remodel

K12 education PORTFOLIO

Hempstead High School Remodel

Dubuque Community School District, Dubuque, IA

SPECIFICATIONS

LOCATION

Dubuque, IA

SIZE

210,000 SF

CLIENT

Dubuque Community School District

ARCHITECT

FEH Design

CONTRACT AMOUNT

$2.2M

FEATURED

Geothermal heating equipment

Photo Credit: Dubuque Community Schools

This 210,000 square-foot middle school was the first school built in the Dubuque school district in 30 years. The project included classrooms for sixth, seventh, and eighth graders, a media center, home economics and music classrooms, a 3-court gym with locker rooms, and lighting for exterior athletic fields. Specific enhancements included a state-of-the-art computer lab, a full sized auditorium, science labs, and a communications auditorium. The electrical scope included connection to geothermal heating equipment, power, lighting, theatrical lighting, computer lab cabling, full voice/data/video cabling, fire alarm, paging, and master clock systems.

Mt. Horeb Intermediate Center

K12 education PORTFOLIO

Mt. Horeb Intermediate Center

Mt. Horeb School District, Mt. Horeb, WI

SPECIFICATIONS

LOCATION

Mt. Horeb, WI

SIZE

90,000 SF

CLIENT

Vogel Bros. Building Co.

ARCHITECT

Potter Lawson

CONTRACT AMOUNT

$1MM

FEATURED

Support for 30 new classrooms equipped with special needs facilities

Photo Credit: Mt. Horeb Area School District

This was a fast-track GMP project on a 90,000 square-foot school that was completed in under a year. The facility includes state-of-the-art lighting, two computer labs, a library, kitchen, site lighting, and a gymnasium for 600 third, fourth, and fifth graders. Westphal & Co., Inc. installed a back-up generator, upgraded life safety systems, and support for 30 new classrooms equipped with special needs facilities. An underground, ½ mile fiber-optic line linked this school with the middle and high schools for integration into their new phone and computer system.

Eleanor Roosevelt Middle School

K12 education PORTFOLIO

Eleanor Roosevelt Middle School

Dubuque School District, Dubuque, IA

SPECIFICATIONS

LOCATION

Dubuque, IA

SIZE

210,000 SF

CLIENT

Miron Construction

ARCHITECT

Durrant Group

CONTRACT AMOUNT

$2.7MM

FEATURED

Geothermal heating equipment

Photo Credit: IIW

This 210,000 square-foot middle school was the first school built in the Dubuque school district in 30 years. The project included classrooms for sixth, seventh, and eighth graders, a media center, home economics and music classrooms, a three-court gym with locker rooms, and lighting for exterior athletic fields. Specific enhancements included a state-of-the-art computer lab, a full-sized auditorium, science labs, and a communications auditorium. The electrical scope included connection to geothermal heating equipment, power, lighting, theatrical lighting, computer lab cabling, full voice/data/video cabling, fire alarm, paging, and master clock systems.

Middleton High School Additions

K12 education PORTFOLIO

Middleton High School Additions

Middleton-Cross Plains School District, Middleton, WI

SPECIFICATIONS

LOCATION

Middleton, WI

SIZE

315,000 SF

CLIENT

Middleton-Cross Plains School District

ARCHITECT

Potter Lawson

CONTRACT AMOUNT

$3.1M

FEATURED

Relocation of school's main service

Photo Credit: Potter Lawson

In this remodel and new construction project, Westphal & Co., Inc. provided electrical and telecom installations to 315,000 square feet at Middleton High School. Single and multi-story lab facilities, a cafeteria, a 900 seat auditorium, and relocation of the school’s main service were all completed within the scope of this project.

Waterford High School Additions

K12 education PORTFOLIO

Waterford High School Additions

Waterford School District, Waterford, WI

SPECIFICATIONS

LOCATION

Waterford, WI

SIZE

122,000 SF

CLIENT

Waterford School District

ARCHITECT

Stubenrauch Architects

CONTRACT AMOUNT

$1.1M

FEATURED

Entire fire alarm system upgrade

Photo Credit: Rachel Kubik (Journal Times)

Westphal & Co., Inc. completed a 122,000 square-foot addition and remodel at Waterford High School. Complete electrical installations were provided to 47,000 square feet of remodeled interior space and 75,000 square feet of new additions. The new construction project added high level technical-education classrooms, a cafeteria, and a 500 seat auditorium. The entire fire alarm system was upgraded, and the adjacent middle school was attached to the high school.

Waunakee Intermediate School

K12 education PORTFOLIO

Waunakee Intermediate School

Waunakee Schools, Waunakee, WI

SPECIFICATIONS

LOCATION

Waunakee, WI

SIZE

157,000 SF

CLIENT

J.H. Findorff & Son, Inc.

ARCHITECT

Eppstein Uhen Architects

CONTRACT AMOUNT

$3.4M

FEATURED

New 2000 amp electrical service

Photo Credit: Eppstein Uhen Architects

This design-assist project is for Waunakee’s new 2-story, 157,000 square-foot intermediate school. We collaborated with the owner, design team, and construction manager to complete the final design, with all the desired finishes, within budget. Our scope includes a new 2000 amp electrical service and feeders, emergency generator set, LED lighting, site lighting, kitchen, cafeteria, gymnasium and fire alarm.

Awards:

  • In Business Magazine Commercial Design Award: Best New Development or Renovation – Education
  • In Business Magazine Commercial Design Award: Best Green-Built Project
  • In Business Magazine Commercial Design Award: Project of the Year 
  • Daily Reporter: Top Projects of 2016

Waunakee Prairie Elementary School Addition

K12 education PORTFOLIO

Waunakee Prairie Elementary School Addition

Waunakee Schools, Waunakee, WI

SPECIFICATIONS

LOCATION

Waunakee, WI

SIZE

13,500 SF

CLIENT

J.H Findorff & Son, Inc.

CONTRACT AMOUNT

$700,000

FEATURED

LED light fixtures

This is a 13,500 square-foot addition which also includes selective remodeling of the existing school. New fire alarm system, emergency power, clock systems as well as LED light fixtures are included in our scope.

West Dubuque High School

K12 education PORTFOLIO

West Dubuque High School

West Dubuque School District, Epworth, IA

SPECIFICATIONS

LOCATION

Epworth, IA

SIZE

42,000 SF

CLIENT

Conlon Construction Co.

ARCHITECT

Neumann Monson Architects

CONTRACT AMOUNT

$1.6MM

FEATURED

Auditorium catwalk lighting

Photo Credit: Neumann Monson Architects

This project consisted of a 42,000 square foot addition as well as selective remodeling of the existing school. The addition consisted of a state-of-the-art 806 seat auditorium in which we installed stage lighting, theatrical lighting, theatrical dimming, and stage lighting rigging. The addition also included a band room and vocal rooms along with workrooms, restrooms, and ancillary spaces. Our scope also included auditorium catwalk lighting, building lighting, power, and fire alarm.

UW-Platteville Williams Fieldhouse

Higher education PORTFOLIO

UW-Platteville Williams Fieldhouse

State of Wisconsin, Platteville, WI

SPECIFICATIONS

LOCATION

Platteville, WI

SIZE

49,600 SF

CLIENT

Kraemer Bros. Construction Co.

CONTRACT AMOUNT

$1.65M

Photo Credit: UW-Platteville

In general, the work consists of a new 49,600 square-foot addition on the west side of the Williams Fieldhouse complex. The project includes a field house with 3 basketball courts, elevated 3 lane running track, additional weight areas, stretching studio, outdoor sports equipment center, outdoor track restrooms, athletic training suite and track locker room. Also, an outdoor multi-sport artificial turf field with sports lighting and storage building will be constructed. The electrical scope of work includes power distribution, lighting, stadium lighting, fire alarm, access controls, cameras, and VDV cabling. This building will be occupied for the duration of the project, so Westphal will work closely with the university and communicate any system turn overs.

UW-Madison Health Sciences Learning Center Renovation

Higher education PORTFOLIO

UW-Madison Health Sciences Learning Center Renovation

State of Wisconsin, Madison, WI

SPECIFICATIONS

LOCATION

Madison, WI

CLIENT

J.P. Cullen

CONTRACT AMOUNT

$2.13MM

Photo Credit: University of Wisconsin

This project included interior renovations of 31,000 SQFT of space in the existing UW Health Sciences Learning Center building. Spaces were remodeled and repurposed to be used for clinical skills assessment suites, simulated patient rooms, multi-purpose learning centers, and a silent study suite. We were responsible for the entire electrical scope including revised electrical distribution, branch power and lighting, fire alarm, low-voltage systems, and backbone and pathways to support owner-furnished AV upgrades. In addition, we provided access control improvements and electrical capital improvement work throughout the entire facility. This project had added complexity as it needed to be specially sequenced and completed in phases to maintain the owner’s deadline for an accreditation visit for these new improvements.

Camp Randall Stadium Addition & Renovation

Camp Randal, UW Madison

Higher education PORTFOLIO

Camp Randall Stadium Addition & Renovation

State of Wisconsin, Madison, WI

SPECIFICATIONS

LOCATION

Madison, WI

CLIENT

J.P. Cullen/C.D. Smith JV

CONTRACT AMOUNT

$12.4MM

Photo Credit: UW Badgers

New additions to the Camp Randall football stadium include 72 luxury suites, 1,000 club seats, restrooms, concessions, and access portals. The Kellner Office Building, housing athletic department staff, was constructed at the south end zone. Varsity team dining and full kitchen facilities were added, as well as locker rooms for the volleyball team and visiting teams. Press facilities were added under the new fan seating on the stadium’s south end, as well as a new video scoreboard, an upgraded stadium sound system and field lighting. Westphal & Co., Inc. installed new fiber and copper voice/data backbones to the stadium and voice, data, video, and distributed CATV cabling to all surrounding facilities.

The the third and fifth level concourses, press box, select areas of the Kohl Center were remodeled. The Kohl Center was also upgraded with a video-broadcast production studio, chiller replacement, ice rink controls, “show time” sports lighting for the court and rink, a suspended video scoreboard, a video ring beam, message board, and voice/data backbone additions.